Under the scope of this project, 6 km long 2x2 lane highway was constructed. Construction work comprises 325,000 tons of asphalt, 1,578,677 m3 of excavation, 979,712 m3 of filling, 39,424 m3 of concrete, 3,263 tons of construction steel, 2,500 m of concrete pipe, 10,500 m oft Ø100 cm insitu piles, 4 junctions, 6 bridges and 96 pipe culverts.