Under the scope of this project, 6 km long 2x2 lane highway was constructed. Construction work comprises 325,000 tons of asphalt, 1,578,677 m3 of excavation, 979,712 m3 of filling, 39,424 m3 of concrete, 3,263 tons of construction steel, 2,500 m of concrete pipe, 10,500 m oft Ø100 cm insitu piles, 4 junctions, 6 bridges and 96 pipe culverts.

  • Azerbaijan
  • Construction
  • 2006

For the functionality of our site, technically necessary cookies are set on this page. Cookies and tracking mechanisms that are technically not required but allow us to analyze our internet traffic and provide you with better user experience and social media features are used only with your consent. You can check the box below to send us your consent or to withdraw your consent in a forward effective manner. For detailed information, please review our Cookie Policy.