Batinah Coastal Road Section I: Barka to Wadam as Sahil (Km: 0+000 - 59+500)

Construction of 60.8 km and 2x2 lane coastal road.

Project also comprises 80 km of service road, 15.5 km of access road, engineering structures, 17 roundabouts and 10 bridges.

Under the scope; 7,800,000 m3 excavation, 7,770,000 m3 filling, 120,000 m3 concrete, 17,500 ton construction steel, 3,166,000 ton plentmix and 982,000 Ton asphalt were also completed.

  • Oman
  • Construction
  • 2010

For the functionality of our site, technically necessary cookies are set on this page. Cookies and tracking mechanisms that are technically not required but allow us to analyze our internet traffic and provide you with better user experience and social media features are used only with your consent. You can check the box below to send us your consent or to withdraw your consent in a forward effective manner. For detailed information, please review our Cookie Policy.