Construction of Antalya 2nd Phase Rail System Lines
Within the scope of the project;
- 19.1 km tram line (12 km ballasted line, 7 km concrete embedded line)
 - 15 stations
 - 4 viaducts (total 1,3 km)
 - 5 bridge crossings
 - 71 km rail installation
 - 6 pedestrian bridges
 - 3 km long and 2x3 lane road extension work between Aksu and EXPO
 
- Turkey
 - Construction
 - 2015
 
 
 