PROJECTS

banner

Construction of Sabiha Gokcen Airport, 2nd Runway and Its Supplements

Within the scope of the project;

  • 3,500 m new runway construction,
  • Two new parallel taxiways each with 3,500 m length,
  • 6 high speed taxiways, 9 connecting taxiways,
  • Two aprons with the area of 600,000 m2 and 144,000 m2 and
  • The construction of a 115 m tall control tower.

In addition, within the scope of the project; technical and service buildings and control tower with a total area of 13,300 m2 were constructed.

  • Turkey
  • Construction
  • 2016

For the functionality of our site, technically necessary cookies are set on this page. Cookies and tracking mechanisms that are technically not required but allow us to analyze our internet traffic and provide you with better user experience and social media features are used only with your consent. You can check the box below to send us your consent or to withdraw your consent in a forward effective manner. For detailed information, please review our Cookie Policy.