Qukes - Qafe Thane Road Rehabilitation
Within the scope of the project, improvement and rehabilitation of 2x1 laned road in length of 20,6 km and construction of 2 bridges were completed;
- 40.000 m3 of concrete manufacture,
- 300.000 m3 of excavation,
- 100.000 m3 of it being with blasting,
- 150.000 m3 of filling,
- 150.000 m2 of superstructure,
- 90.000 tons of bituminous hot mixture manufactures were made.
- Albania
- Construction
- 2000