Construction of Antalya 2nd Phase Rail System Lines

Within the scope of the project;

  • 19.1 km tram line (12 km ballasted line, 7 km concrete embedded line)
  • 15 stations
  • 4 viaducts (total 1,3 km)
  • 5 bridge crossings
  • 71 km rail installation
  • 6 pedestrian bridges
  • 3 km long and 2x3 lane road extension work between Aksu and EXPO
  • Turkey
  • Construction
  • 2015

For the functionality of our site, technically necessary cookies are set on this page. Cookies and tracking mechanisms that are technically not required but allow us to analyze our internet traffic and provide you with better user experience and social media features are used only with your consent. You can check the box below to send us your consent or to withdraw your consent in a forward effective manner. For detailed information, please review our Cookie Policy.