Construction of Antalya 2nd Phase Rail System Lines
Within the scope of the project;
- 19.1 km tram line (12 km ballasted line, 7 km concrete embedded line)
- 15 stations
- 4 viaducts (total 1,3 km)
- 5 bridge crossings
- 71 km rail installation
- 6 pedestrian bridges
- 3 km long and 2x3 lane road extension work between Aksu and EXPO
- Turkey
- Construction
- 2015