Duhok Airport
Under the scope of the International Airport Project;
- 24,200,005 m3 excavation and filling,
- 330,000 tons of Asphalt,
- Construction of 3,850 m Runway,
- 1,890 m Taxiway,
- Together with total 42,000 m2 indoor area including 24,000 m2 terminal building,
- Air bridge (3 fixed + 4 mobile) will be constructed.
- Northern Iraq
- Construction
- 2013