PROJECTS

banner

Kadıköy - Kartal Metro, Completion of Civil Works and Supply, Installation and Commissioning of Electro-Mechanical Systems

  • 26.25 km double tube New Metro Line Construction (including 4.5 km double tube extension line constructed with TBM)
  • 15 stations
  • Total of 46 km tunnel construction and rail works including the extension line
  • Procurement, installation, and commissioning of electro - mechanical systems
  • Electricity supply and distribution
  • Signalization, telecommunications, lighting, escalator & elevator, ventilation Plumbing, and drainage works.
  • Turkey
  • Construction
  • 2008

For the functionality of our site, technically necessary cookies are set on this page. Cookies and tracking mechanisms that are technically not required but allow us to analyze our internet traffic and provide you with better user experience and social media features are used only with your consent. You can check the box below to send us your consent or to withdraw your consent in a forward effective manner. For detailed information, please review our Cookie Policy.